Banner Image Missing
Emergency Repairs to Begin on Sheridan Street Turnpike Overpass
  
- Intermittent road closures to start December 4 -
  

BROWARD COUNTY, FL - The Highway and Bridge Maintenance Division will perform emergency repairs on the County-owned Sheridan Street Bridge over the Florida Turnpike in Hollywood between North 64th Avenue and SR7 (441). The work is scheduled to begin on December 4, 2022 and be completed by December 23, 2022, barring any unforeseen conditions or weather delays. 

The project involves permanent repair work that will address recent damage caused by an over-height vehicle that struck and completely damaged two of the bridge's concrete beams. Since the incident in October, one of the eastbound lanes of Sheridan Street has been closed.

This is the first phase of the project, which will replace the damaged concrete beams with more robust beams and restore all the lanes of Sheridan Street, the sidewalk and barrier walls that were damaged from the bridge strike. 

Traffic Control (see attached road closure plan below): 

Florida's Turnpike:

Intermittent northbound closures from Hollywood Boulevard (Exit 49) to Griffin Road (Exit 53). Nightly lane closures in both directions. 

Sheridan Street: 

Eastbound closure between December 4 and December 12. Then, one lane will be open to traffic. At least one westbound lane will be open during the entire project. 

A road closure plan has been developed to minimize the effect of the construction on the traveling public, businesses and residents, complete with detour routes. (See attached detour maps). Construction activities will occur 24 hours per day, 7 days a week during the first two weeks of the project; then, all construction activities will occur only at night. Variable message signs will be posted to advise affected motorists. Florida Highway Patrol officers will be on-site to support construction activities and Broward County's Traffic Engineering staff will assist in retiming the traffic signals along the detour route. 

HBMD can be reached at 954-357-6040 or Project Manager Ben Abidian can be reached at 954-299-6466 or babidian@broward.org. The County appreciates your patience as we complete this necessary repair project.

About Highway and Bridge Maintenance Division 

The Highway and Bridge Maintenance Division maintains and improves the County's highway/street system, operates drawbridges and oversees mosquito control operations. The Division is responsible for cleaning and mowing rights-of-way, street patching and resurfacing, intersection improvements, canal maintenance and construction, guardrail maintenance, bridge maintenance, street cleaning and stormwater drainage improvements.

 

November 30, 2022

MEDIA CONTACT: Anh Ton, P.E., Director

Highway and Bridge Maintenance Division

954-357-6059

aton@broward.org