Banner Image Missing
Broward County To Perform Drainage and Roadway Repairs in Fort Lauderdale
  
- Construction to affect traffic June 16 through July 28 -
  

DATE: June 2, 2014
MEDIA CONTACT: Anh Ton, Director
Broward County Highway and Bridge Maintenance Division
PHONE: 954-357-6059
EMAIL:
aton@broward.org

BROWARD COUNTY, Fla. - Broward County Highway and Bridge Maintenance Division will be performing drainage and roadway repairs on Southwest 27 Avenue (Riverland Road) between Southwest Sixth Street and Southwest Fourth Place, Fort Lauderdale, from June 16 through July 28, barring unforeseen conditions or weather delays.

The public should be aware of the following:

  • Construction will impact motor vehicle traffic as only one lane of Southwest 27 Avenue in each direction will remain open at all times.
     
  • Access to residential and business driveways will be provided.

  • Pedestrian access will be maintained at all times using the existing sidewalks.

Any questions should be directed to Luis Velez, project manager with the Broward County Highway and Bridge Maintenance Division, at 954-357-5942 or Broward County Highway and Bridge Maintenance Administrative Office at 954-357-6040.

A map of the construction area is attached, below.

About Highway and Bridge Maintenance Division
The Highway and Bridge Maintenance Division is responsible for the maintenance and in-house construction of County road and highway projects, curbs and gutters, guardrails, rights-of-ways, roads, sidewalks, storm water systems, streets, swales and trees. Staff resources are available for 24-hour emergency services. Call 954-357-6040 for more information or visit Highway and Bridge Maintenance.

AttachmentDownload
06022014_ SW 27 Ave project.pdf