Banner Image Missing
Bridge Maintenance Scheduled in Plantation
  
- Work to begin July 19 -
  

BROWARD COUNTY, FL – Highway and Bridge Maintenance Division will be performing bridge maintenance on the County-owned bridge located on Pine Island Road over the New River Canal (just north of SR-84) in Plantation (refer to map attached below). The project will begin on July 19, 2021 and will conclude in October 2021, barring any unforeseen conditions or weather delays.

The purpose of the work is to replace bridge joints. During construction, at least one lane in each direction of Pine Island Road will be open to traffic. Temporary lane closures will be limited to non-peak traffic hours (9AM to 4PM) and access to the New River Greenway, businesses, sidewalks and driveways will be maintained. Signs will be posted to warn affected motorists and pedestrians.

Highway and Bridge Maintenance Division can be reached at 954-357-6040. Project Manager, Wilfredo Acevedo-Diaz, can be reached at 954-299-2944 or wacevedodiaz@broward.org.

Broward County appreciates your patience as we complete this necessary bridge repair project.

About Highway and Bridge Maintenance Division
The Highway and Bridge Maintenance Division maintains and improves the County's highway/street system, operates drawbridges, and oversees mosquito control operations. The Division is responsible for cleaning and mowing rights-of-way, street patching and resurfacing, intersection improvements, canal maintenance and construction, guardrail maintenance, bridge maintenance, street cleaning, and stormwater drainage improvements.

July 15, 2021
MEDIA CONTACT: 
Adriana Toro, Acting Director
Highway and Bridge Maintenance Division
954-357-6040
Atoro@Broward.org

AttachmentDownload
Bridge Project.jpg