Banner Image Missing
NW 27th Avenue Bridge Repair in Washington Park
  
- Weekend lane closures in the evening/overnight begin February 24 -
  

BROWARD COUNTY, FLHighway and Bridge Maintenance Division (HBMD) will be performing major bridge rehabilitation on the County-owned bridge on NW 27th Avenue over the C-12 Canal (North Folk New River) between NW 6th Street and W Sunrise Boulevard. (See attached map.) The work is scheduled to begin on Friday, February 24 and will conclude Monday, February 27 barring any unforeseen conditions and/or weather delays. 

Lane closures will take place during the evening/overnight hours to waterproof and resurface the bridge deck. However, one lane in each direction will be open at all times to minimize traffic impacts. Variable message signs will be posted to advise affected motorists and pedestrians. All lanes will be back open on Sunday, February 26 after 7AM.

The recommended repairs identified by the Florida Department of Transportation will enhance the longevity of the structure by using an innovative deck strengthening design and construction method developed by HBMD. This method, one of the first in Florida, minimizes construction impacts to the public by mainly working on the underside of the bridge. Watch video of the bridge repair method. 

Highway and Bridge Maintenance Division can be reached at 954-647-6490. Project Manager Stanley Bateman can be reached at 954-357-4991 or sbateman@broward.orgThe project is funded by the gas tax.

Broward County appreciates your patience as we complete this necessary bridge repair project.

About Highway and Bridge Maintenance Division 

The Highway and Bridge Maintenance Division maintains and improves the County's highway/street system, operates drawbridges and oversees mosquito control operations. The Division is responsible for cleaning and mowing rights-of-way, street patching and resurfacing, intersection improvements, canal maintenance and construction, guardrail maintenance, bridge maintenance, street cleaning and stormwater drainage improvements.

February 16, 2023
MEDIA CONTACT: Anh Ton, P.E., Director
Highway and Bridge Maintenance Division
954-357-6059
aton@broward.org



AttachmentDownload
project map nw 27th avenue.jpg